v50 Steam/Premium information for editors
  • v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
  • Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.

Editing v0.31:Scheduling

Jump to navigation Jump to search

Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.

You are editing a page for an older version of Dwarf Fortress ("Main" is the current version, not "v0.31"). Please make sure you intend to do this. If you are here by mistake, see the current page instead.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.

Latest revision Your text
Line 30: Line 30:
 
===Schedules===
 
===Schedules===
  
Each squad can be given multiple '''schedules''' to follow for an entire year, broken up by month. Each squad has a separate schedule for each alert level; it can be swapped between these schedules with the procedure outlined in the previous section. Without scheduling, alert levels would do nothing; without alert levels scheduling would be horribly inefficient; the two functions co-exist and rely on each other. The scheduling screen can be accessed by pressing {{k|s}} in the {{k|m}}ilitary screen.
+
Each squad can be given multiple '''schedules''' to follow for an entire year, broken up by month. Each squad has a separate schedule for each alert level; it can be swapped between these schedules with the procedure outlined in the previous section. Without scheduling, alert levels would do nothing; without alert levels scheduling would be horribly inefficient; the two functions co-exist and rely on each other. The scheduling screen can be accessed by pressing {{k|s}} in the military screen.
  
 
On the main scheduling page you will see a list of months on the left side and a list of all of the squads in your fortress along the top edge. Scheduling is done separately for each alert level; to switch between alert levels use the secondary page up/down keys (by default {{k|/}} and {{k|*}}). You can use the secondary up/down keys (by default {{k|+}} and {{k|-}}) to scroll through the squads at the top if you have more than will fit on one screen. Use the up/down arrow keys to navigate the month list, and the left/right arrow keys to navigate between squads.  The orders in the currently selected cell are displayed in blue towards the bottom of the screen.
 
On the main scheduling page you will see a list of months on the left side and a list of all of the squads in your fortress along the top edge. Scheduling is done separately for each alert level; to switch between alert levels use the secondary page up/down keys (by default {{k|/}} and {{k|*}}). You can use the secondary up/down keys (by default {{k|+}} and {{k|-}}) to scroll through the squads at the top if you have more than will fit on one screen. Use the up/down arrow keys to navigate the month list, and the left/right arrow keys to navigate between squads.  The orders in the currently selected cell are displayed in blue towards the bottom of the screen.

Please note that all contributions to Dwarf Fortress Wiki are considered to be released under the GFDL & MIT (see Dwarf Fortress Wiki:Copyrights for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. Do not submit copyrighted work without permission!

To protect the wiki against automated edit spam, we kindly ask you to solve the following CAPTCHA:

Cancel Editing help (opens in new window)

Templates used on this page: