v50 Steam/Premium information for editors
- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.
Editing v0.34:Bridge
Jump to navigation
Jump to search
Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.
You are editing a page for an older version of Dwarf Fortress ("Main" is the current version, not "v0.34"). Please make sure you intend to do this. If you are here by mistake, see the current page instead.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 59: | Line 59: | ||
A raised bridge cannot be linked to a lever from the inside - the mechanic must be able to access the center tile of the bridge when lowered. | A raised bridge cannot be linked to a lever from the inside - the mechanic must be able to access the center tile of the bridge when lowered. | ||
− | If you aren't sure whether or not a 1 tile thick bridge is raised or lowered, try to build a piece of furniture, like a statue, on it. If it says blocked, the bridge is raised, if it says building present, it is lowered | + | If you aren't sure whether or not a 1 tile thick bridge is raised or lowered, try to build a piece of furniture, like a statue, on it. If it says blocked, the bridge is raised, if it says building present, it is lowered. |
==Uses== | ==Uses== |