v50 Steam/Premium information for editors
  • v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
  • Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.

Editing Double-slit method

Jump to navigation Jump to search

Warning: You are not logged in.
Your IP address will be recorded in this page's edit history.

If you are creating a redirect to the current version's page, do not use any namespace. For example: use #REDIRECT [[Cat]], not #REDIRECT [[Main:Cat]] or #REDIRECT [[cv:Cat]]. See DF:Versions for more information.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.

Latest revision Your text
Line 319: Line 319:
 
Congratulations to your 4×2 hole through the aquifer. Be very careful not to mine the first non-aquifer layer any wider than your secured staircase dimensions. The aquifer above this level would flood it. Leave at least one layer of stone between your aquifer and the layer where you want some spacy rooms.
 
Congratulations to your 4×2 hole through the aquifer. Be very careful not to mine the first non-aquifer layer any wider than your secured staircase dimensions. The aquifer above this level would flood it. Leave at least one layer of stone between your aquifer and the layer where you want some spacy rooms.
  
 
==Variations==
 
 
* [[Door]]s can be built diagonally, allowing you to dig out and "door off" difficult-to-reach tiles one at a time. Make sure you include a drain at the bottom of the stairway in case a marauding troll or tantruming dwarf decides to destroy your dam doors.
 
* It isn't really necessary to move the pump vertically. Not moving the pump up will simplify logistics at the cost of slower construction on the tiles further from the pump (more job cancellations). 
 
* The double-slit method can easily be extended to a 4x3 footprint. By reserving the middle stairs for access, you can avoid all deconstruction and reconstruction of floors and stairs. You can also build and operate two pumps simultaneously to increase safety and speed up construction on the lowest aquifer level. When finished, you can create a 3x3 central stair through the aquifer.
 
 
 
==Links==
 
==Links==
 
* [http://youtu.be/TXQH9dliFZE A good youtube tutorial] covering this method, taking the shortcut later and working the aquifer from below
 
* [http://youtu.be/TXQH9dliFZE A good youtube tutorial] covering this method, taking the shortcut later and working the aquifer from below

Please note that all contributions to Dwarf Fortress Wiki are considered to be released under the GFDL & MIT (see Dwarf Fortress Wiki:Copyrights for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. Do not submit copyrighted work without permission!

To protect the wiki against automated edit spam, we kindly ask you to solve the following CAPTCHA:

Cancel Editing help (opens in new window)

This page is a member of 1 hidden category: