v50 Steam/Premium information for editors
  • v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
  • Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.

Difference between revisions of "User:VengefulDonut/Aquifer"

From Dwarf Fortress Wiki
Jump to navigation Jump to search
m
m
 
Line 2: Line 2:
 
====0====
 
====0====
 
Prerequisites:
 
Prerequisites:
#You will need 2 stone (0 if the aquifer is made of rock).
 
 
#You will need to know how a [[screw pump#Stacked pumps|reynard tower]] works.
 
#You will need to know how a [[screw pump#Stacked pumps|reynard tower]] works.
#You will need to know how to generate power.
+
#You will need to know how to generate and hook up power.
 +
#You will need materials for constructing and hooking up power.
 
#You will need enough materials to construct 5 screw pumps. If N is more than 5, you will need materials for N screw pumps.
 
#You will need enough materials to construct 5 screw pumps. If N is more than 5, you will need materials for N screw pumps.
#You will need logs for axles and water wheels (or windmills).
 
 
#You will need wall-building materials.
 
#You will need wall-building materials.
 
{| style="float:right"
 
{| style="float:right"
 
|-  
 
|-  
|{{:User:VengefulDonut/Aquifer/fig1}}
+
|{{:User:VengefulDonut/Aquifer/fig2}}{{:User:VengefulDonut/Aquifer/fig1}}
 
|-  
 
|-  
| {{:User:VengefulDonut/Aquifer/fig3}}{{:User:VengefulDonut/Aquifer/fig2}}
+
|{{:User:VengefulDonut/Aquifer/fig3}}
 
|-  
 
|-  
 
|{{:User:VengefulDonut/Aquifer/fig4}}
 
|{{:User:VengefulDonut/Aquifer/fig4}}
Line 28: Line 27:
  
 
====3====
 
====3====
Dig an access shaft to the side. That will go to your power generator later. Dig a second access shaft for draining water into level 1. (We won't need any power or drainage until we are dealing with the last level)
+
Build floors to place a screw pump.
 +
 
 +
Channel out the pump intake tile.
 
*(fig 1)
 
*(fig 1)
  
 
====4====
 
====4====
Build floors to place a screw pump.
+
Construct a [[screw pump]] on the floor tile. Orientation isn't important.
 
 
Channel out the pump intake tile.
 
 
*(fig 2)
 
*(fig 2)
  
 
====5====
 
====5====
Construct a [[screw pump]] on the floor tile. Orientation isn't important.
+
While a dwarf is operating the pump, dig out an up/down staircase on level 2 directly below the channel.
 
*(fig 3)
 
*(fig 3)
  
 
====6====
 
====6====
While a dwarf is operating the pump, dig out an up/down staircase on level 2 directly below the channel.
+
The water from level 1 being drained into level 2 will allow you to dig out the same array of up/down staircases as on level 1.
 +
 
 +
Side note: using this technique, you can now expand levels 1 and 2 to any degree you want. You could even build your fortress inside the aquifer.
 
*(fig 4)
 
*(fig 4)
  
 
====7====
 
====7====
The water from level 1 being drained into level 2 will allow you to dig out the same array of up/down staircases as on level 1.
+
Wall off level 1 from the aquifer and deconstruct the screw pump.
 
 
Side note: using this technique, you can now expand levels 1 and 2 to any degree you want. You could even build your fortress inside the aquifer.
 
 
*(fig 5)
 
*(fig 5)
  
 
====8====
 
====8====
Wall off level 1 from the aquifer and deconstruct the screw pump.
+
Repeat steps 3-7 until you reach the last layer of aquifer (level N). Only dig a 5x5 staircase on level N.
*(fig 6)
+
 
 +
The last layer of aquifer can be identified by looking at the type of stone on the next layer. It is revealed when you dig the first staircase.
  
 
====9====
 
====9====
Repeat steps 4-8 until you reach the last layer of aquifer (level N). Only dig a 5x5 staircase on level N.
+
Build a row of floors along the center of level N-1
 
+
*(fig 6)
The last layer of aquifer can be identified by looking at the type of stone on the next layer. It is revealed when you dig the first staircase.
 
  
 
====10====
 
====10====
 
+
Set up a power source for the screw pumps that attaches directly above the center of level N-1.
 
 
  
 
====11====
 
====11====
 +
If you set up the input correctly, you should be able to build screw pumps on the floors. Orient them all in the same direction and then channel out the intakes.
 +
*(fig 7)

Latest revision as of 14:28, 14 April 2008

VengefulDonut's method for getting through an N level aquifer (incomplete)[edit]

0[edit]

Prerequisites:

  1. You will need to know how a reynard tower works.
  2. You will need to know how to generate and hook up power.
  3. You will need materials for constructing and hooking up power.
  4. You will need enough materials to construct 5 screw pumps. If N is more than 5, you will need materials for N screw pumps.
  5. You will need wall-building materials.
Fig 2
Template:Qd
Fig 1
Template:Qd
Fig 3
z0 z1 z2
Template:Qd Template:Qd Template:Qd
Fig 4
z1 z2
Template:Qd Template:Qd
Fig 5
z1
Template:Qd
Fig 6
z1
Template:Qd

1[edit]

Reach the aquifer level. I will refer to the level above the aquifer as level 0. I'm going to increase the numbers with depth. Level 1 is the first aquifer level.

2[edit]

Dig an array of up/down staircases on level 1. This guide will refer to 7x7 because I prefer 7x7. This can be modified for different sizes.

3[edit]

Build floors to place a screw pump.

Channel out the pump intake tile.

  • (fig 1)

4[edit]

Construct a screw pump on the floor tile. Orientation isn't important.

  • (fig 2)

5[edit]

While a dwarf is operating the pump, dig out an up/down staircase on level 2 directly below the channel.

  • (fig 3)

6[edit]

The water from level 1 being drained into level 2 will allow you to dig out the same array of up/down staircases as on level 1.

Side note: using this technique, you can now expand levels 1 and 2 to any degree you want. You could even build your fortress inside the aquifer.

  • (fig 4)

7[edit]

Wall off level 1 from the aquifer and deconstruct the screw pump.

  • (fig 5)

8[edit]

Repeat steps 3-7 until you reach the last layer of aquifer (level N). Only dig a 5x5 staircase on level N.

The last layer of aquifer can be identified by looking at the type of stone on the next layer. It is revealed when you dig the first staircase.

9[edit]

Build a row of floors along the center of level N-1

  • (fig 6)

10[edit]

Set up a power source for the screw pumps that attaches directly above the center of level N-1.

11[edit]

If you set up the input correctly, you should be able to build screw pumps on the floors. Orient them all in the same direction and then channel out the intakes.

  • (fig 7)