v50 Steam/Premium information for editors
  • v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
  • Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.

Difference between revisions of "v0.34:Trading/Flowchart"

From Dwarf Fortress Wiki
Jump to navigation Jump to search
(no need here)
m (spelling, categorize, links)
Line 33: Line 33:
 
{{Flowchart Box|Create [[goods]]|5}}
 
{{Flowchart Box|Create [[goods]]|5}}
 
|colspan=5|
 
|colspan=5|
{{Flowchart Box|Build Depot}}
+
{{Flowchart Box|Build [[Depot]]}}
 
|-
 
|-
 
|colspan=6|
 
|colspan=6|
Line 46: Line 46:
 
|-
 
|-
 
|colspan=5|
 
|colspan=5|
{{Flowchart Box|Wait for caravan}}
+
{{Flowchart Box|Wait for [[caravan]]}}
 
|-
 
|-
 
|colspan=1|
 
|colspan=1|
Line 75: Line 75:
 
{{Flowchart Box|Wait for caravan to arrive at depot and merchants to finish unloading|3}}
 
{{Flowchart Box|Wait for caravan to arrive at depot and merchants to finish unloading|3}}
 
|
 
|
{{Flowchart Box|Wait for the [[liason]] (if any) to reach your trader}}
+
{{Flowchart Box|Wait for the [[liaison]] (if any) to reach your trader}}
 
|-
 
|-
 
|colspan=1|
 
|colspan=1|
Line 84: Line 84:
 
{{Flowchart Box|Wait for goods to be hauled}}
 
{{Flowchart Box|Wait for goods to be hauled}}
 
|colspan=5|
 
|colspan=5|
{{Flowchart Box|Turn your trader's labors off so he doesn't get distracted}}
+
{{Flowchart Box|Turn your trader's [[labor]]s off so he doesn't get distracted}}
 
|-
 
|-
 
|colspan=1|
 
|colspan=1|
Line 101: Line 101:
 
{{Flowchart Vertical Bar}}
 
{{Flowchart Vertical Bar}}
 
|colspan=4|
 
|colspan=4|
{{Flowchart Box|Conduct all 8 meetings with the liason|4}}
+
{{Flowchart Box|Conduct all 8 meetings with the liaison|4}}
 
|-
 
|-
 
|colspan=7 rowspan=1 style="border: 1px solid #aaa;" align=center height=50|Request trader at Depot<br>(Interrupting meetings if required)
 
|colspan=7 rowspan=1 style="border: 1px solid #aaa;" align=center height=50|Request trader at Depot<br>(Interrupting meetings if required)
Line 129: Line 129:
 
|-
 
|-
 
|colspan=4|
 
|colspan=4|
{{Flowchart Box|Retreive bins from Depot to reuse}}
+
{{Flowchart Box|Retrieve [[bin]]s from Depot to reuse}}
 
|}
 
|}
 +
 +
[[Category:World]]
 +
[[Category:Trade]]

Revision as of 01:07, 25 October 2009

Suggested trading procedure
Arrive at fortress location
Create goods Build Depot
Check Depot is accessible
Wait for caravan
Set goods to be traded Wait for caravan to arrive at depot and merchants to finish unloading Wait for the liaison (if any) to reach your trader
Wait for goods to be hauled Turn your trader's labors off so he doesn't get distracted
Conduct all 8 meetings with the liaison
Request trader at Depot
(Interrupting meetings if required)
Trade
Turn trader's labors back on
Retrieve bins from Depot to reuse