- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
Difference between revisions of "v0.31:Construction"
m |
|||
Line 3: | Line 3: | ||
'''Constructions''' are buildings such as {{L|floor|floors}}, {{L|wall|walls}} and {{L|stair|stairs}}. They can be made of any solid material, {{L|wood}}, {{L|stone}}, {{L|metal}} or {{L|glass}}, and are accessed by pressing the {{k|b}}uild-{{k|C}}onstruction keys. | '''Constructions''' are buildings such as {{L|floor|floors}}, {{L|wall|walls}} and {{L|stair|stairs}}. They can be made of any solid material, {{L|wood}}, {{L|stone}}, {{L|metal}} or {{L|glass}}, and are accessed by pressing the {{k|b}}uild-{{k|C}}onstruction keys. | ||
+ | Unlike most objects accessed from the {{k|b}}uild menu, Constructions are treated as inert terrain features when completed, and can only be interacted with by loo{{k|k}}-ing at them or by pressing {{k|d}}-{{k|n}} to designate their removal. Using the {{k|q}}uery or {{k|t}}ask selection will give no information after the construction is completed, but will allow {{L|removal}}, suspension, and an idea of the current status before the Construction is complete. | ||
+ | |||
+ | == Constructions and Designated formations == | ||
+ | |||
+ | Constructions are similar to {{L|Mining|designated formations}}. However, unlike the {{L|wall|walls}} and {{L|floor|floors}} surrounding {{L|Mining|mined}} or {{L|Channel|channeled}} spaces, constructed walls cannot be smoothed or engraved. In order to have smooth quality {{L|wall|walls}} and {{L|floor|floors}}, {{L|block|blocks}} need to be used in place of raw {{L|stone}}. | ||
+ | |||
+ | == Order of Construction == | ||
+ | |||
+ | Constructions are built in a Last-In-First-Out(LIFO) order. That means that whichever Constructions are ordered first will be built last. Also, if there is a large group of Constructions being built, and a new set of constructions is ordered, the Constructions in progress will be ignored until the new constructions are finished. | ||
+ | |||
+ | Respecting the LIFO order is also necessary to efficiently and correctly construct {{L|Tower|multi-z-level walls}}. | ||
See also [[DF2010:Mega construction]] | See also [[DF2010:Mega construction]] |
Revision as of 00:22, 8 June 2010
This article is about an older version of DF. |
Constructions are buildings such as Template:L, Template:L and Template:L. They can be made of any solid material, Template:L, Template:L, Template:L or Template:L, and are accessed by pressing the build-Construction keys.
Unlike most objects accessed from the build menu, Constructions are treated as inert terrain features when completed, and can only be interacted with by look-ing at them or by pressing d-n to designate their removal. Using the query or task selection will give no information after the construction is completed, but will allow Template:L, suspension, and an idea of the current status before the Construction is complete.
Constructions and Designated formations
Constructions are similar to Template:L. However, unlike the Template:L and Template:L surrounding Template:L or Template:L spaces, constructed walls cannot be smoothed or engraved. In order to have smooth quality Template:L and Template:L, Template:L need to be used in place of raw Template:L.
Order of Construction
Constructions are built in a Last-In-First-Out(LIFO) order. That means that whichever Constructions are ordered first will be built last. Also, if there is a large group of Constructions being built, and a new set of constructions is ordered, the Constructions in progress will be ignored until the new constructions are finished.
Respecting the LIFO order is also necessary to efficiently and correctly construct Template:L.
See also DF2010:Mega construction