- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
Difference between revisions of "40d:Mineshaft stitching"
Line 4: | Line 4: | ||
<pre style="font:bold 20px/1 'Courier New';color:#ccc;background:black;width:auto;padding:5px;float:left"> | <pre style="font:bold 20px/1 'Courier New';color:#ccc;background:black;width:auto;padding:5px;float:left"> | ||
▒▒▒▒▒▒▒▒▒ | ▒▒▒▒▒▒▒▒▒ | ||
− | . | + | .X▒▒X..X▒ |
− | + | ▒▒▒▒▒▒▒▒▒ | |
− | + | ▒▒▒▒▒▒▒▒▒ | |
− | + | ▒X..X▒▒X▒ | |
▒▒▒▒▒▒▒▒▒ | ▒▒▒▒▒▒▒▒▒ | ||
+ | |||
</pre> | </pre> | ||
{{-}} | {{-}} | ||
Line 22: | Line 23: | ||
<pre style="font:bold 20px/1 'Courier New';color:#ccc;background:black;width:auto;padding:5px;float:left"> | <pre style="font:bold 20px/1 'Courier New';color:#ccc;background:black;width:auto;padding:5px;float:left"> | ||
▒▒▒▒▒▒▒▒▒ | ▒▒▒▒▒▒▒▒▒ | ||
− | + | ▒X▒▒X▒▒X▒ | |
− | + | ▒.▒▒.▒▒.▒ | |
− | + | ▒.▒▒.▒▒.▒ | |
− | + | ▒X▒▒X▒▒X▒ | |
▒▒▒▒▒▒▒▒▒ | ▒▒▒▒▒▒▒▒▒ | ||
</pre> | </pre> |
Revision as of 17:33, 30 March 2009
When using mine shafts, dwarves will prefer to dig all of one level before moving on to the next. This can result in a lot of time spent moving, as miners go up and down mine shafts. If you have a large number of relatively unskilled miners, this is unlikely to be a problem: digging time will dominate in any case. If you have one or two legendary miners, this is quite annoying. As a solution, you can creating a single path that forces your dwarf to finish one shaft before moving on to the next. To do so, connect shafts alternately at the top and bottom layers, so the shaft snakes through the area. For example, the top, middle, and bottom layers could look like:
▒▒▒▒▒▒▒▒▒ .X▒▒X..X▒ ▒▒▒▒▒▒▒▒▒ ▒▒▒▒▒▒▒▒▒ ▒X..X▒▒X▒ ▒▒▒▒▒▒▒▒▒
▒▒▒▒▒▒▒▒▒ ▒X▒▒X▒▒X▒ ▒▒▒▒▒▒▒▒▒ ▒▒▒▒▒▒▒▒▒ ▒X▒▒X▒▒X▒ ▒▒▒▒▒▒▒▒▒
▒▒▒▒▒▒▒▒▒ ▒X▒▒X▒▒X▒ ▒.▒▒.▒▒.▒ ▒.▒▒.▒▒.▒ ▒X▒▒X▒▒X▒ ▒▒▒▒▒▒▒▒▒
Note that this pattern creates a very long walkway back to the start of the mineshafts. If you do not excavate routinely, consider connecting the top-level paths of areas you have already explored.
AKH script
An AKH script to construct such a pattern is provided below, based on this script, but using many fewer keystrokes.
;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;; ; stitching.ahk ; ; this is an ahk script to place exploratory mine shafts. ; ; press d and place the cursor ; ; in the top left corner of the area to be explored ; ; then use ctrl+shift+s to run ; ; to change parameters, use ctrl+shift+c ; ; Increasing spacing will increase some shafts ; ; ; NOTE: ; ; Author: Seth Fogarty ; ; Based on a script by StrawberryBunny ; ;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;; x = 4 y = 4 depth = 3 wait = 100 spacing = 1 vdir = +. DropShaft(vertdir, depth, wait) { Send i Send {Enter} Send {Enter} Loop %depth% { Send %vertdir% Send {Enter} Send {Enter} Sleep %wait% } } ^+c:: inputbox x, Input Length, Vertical pattern length: x-axis inputbox y, Input Width, Horizontal pattern width: y-axis inputbox depth, Input Depth, Mineshaft depth: z-axis inputbox spacing, Input Spacing, Spacing multiplier (1 for complete visiblity) inputbox wait, Input Delay, Delay in miliseconds (100 recommended) return ^+s:: shafts := (x * y) -1 i := x-1 hdir = {Down} next = {Up} Loop %shafts% { DropShaft(vdir, depth, wait) if (vdir = "+.") { vdir = +, } else { vdir = +. } Send d k := spacing-1 Send %hdir% Send {Enter} Loop %k% { Send %hdir% Send {Enter} Send %hdir% Send {Enter} Send %hdir% Sleep %wait% } Send %hdir% Send {Enter} Send %hdir% Sleep %wait% i-- if (i = 0) { if (hdir = "{Down}") { hdir = {Right} next = {Up} i=1 } else if (hdir = "{Right}") { hdir = %next% i := x-1 } else if (hdir = "{Up}") { hdir = {Right} next = {Down} i=1 } } } DropShaft(vdir, depth, wait) if (vdir = "+.") { Loop %depth% { Send +, } } return