v50 Steam/Premium information for editors
- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.
Difference between revisions of "File:Digging Channeling tiles.PNG"
Jump to navigation
Jump to search
(Demonstrating the difference between digging (mining) and channeling. Digging creates empty space on the same level where it is designated. Channeling creates empty space in the level below, clearing the floor. The levels are connected by up/down ramps.) |
Doorkeeper (talk | contribs) (Doorkeeper uploaded a new version of "File:Digging Channeling tiles.PNG": removed window border) |
Latest revision as of 19:07, 16 October 2016
Demonstrating the difference between digging (mining) and channeling. Digging creates empty space on the same level where it is designated. Channeling creates empty space in the level below, clearing the floor. The levels are connected by up/down ramps.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 19:07, 16 October 2016 | 800 × 600 (31 KB) | Doorkeeper (talk | contribs) | removed window border | |
12:50, 13 January 2014 | 808 × 667 (62 KB) | Doktoro Reichard (talk | contribs) | Demonstrating the difference between digging (mining) and channeling. Digging creates empty space on the same level where it is designated. Channeling creates empty space in the level below, clearing the floor. The levels are connected by up/down ramps. |
You cannot overwrite this file.
File usage
The following 2 pages use this file: