QuantumMenace has developed a very easy method how to dig through an aquifer of an unknown depth commonly known as the double-slit method. Its name derives from two channeled-out slits around a 2×2 staircase.
The slits are used to break into the aquifer layer below, hence their ramps are flooded (blue). During the process of securing the aquifer layer, water is being pumped from one slit to another. The screw pump can pump the water from one slit to another slightly faster than the aquifer floods it. This enables the dwarves to use the ramp of the slit to access the aquifer layer, mine one or two tiles of it and build walls which would seal off the aquifer.
Draining an aquifer
Aquifers produce infinite amounts of water, but they can also absorb infinite amounts of it. This makes it possible to pump out the water from one slit to the level above the aquifer and let it fall back down and become absorbed by the same aquifer layer again.
The core idea of the double-slit method is to deconstruct half of the 2×2 stairs to place a pump there. While a dwarf operates the pump, another dwarf can access the source slit via the ramp and seal off the surrounding walls of the aquifer one by one.
When dealing with aquifers of two or more z-levels, it is much more convenient to use the lower aquifer level for absorbing all of the water being produced by the higher aquifer level.
This only works if you manage to crack open the lower aquifer level. While the upper aquifer level is being pumped dry, a dwarf can channeling or dig a stairs into the lower aquifer level, cracking it open and allowing it to receive any water coming from above.
Tutorial embark setup
Even in this newbie-friendly tutorial it won't harm if you first train this on an embark which you don't intend to play after you've made it through the aquifer. Therefore I suggest you take this embark setup:
- 1 Proficient Miner
- 4 Proficient Masons
- 1 Proficient Carpenter
- 1 Proficient Woodcutter
sell the anvil to buy:
- 30+ stones (you will need 16 pieces of building material per aquifer level)
- 4 logs (to build a carpenter's workshop and the components of a pump)
Make sure you have at least:
- 1 (battle) axe
- 1 pick
to cut down trees and mine
Procedure
Preparation
Using your logs of wood, build a carpenter's workshop and craft all the parts necessary to build a pump, i.e.:
- a block
- an enormous corkscrew
- a pipe section
Digging through the aquifer
Dig a 2×2 staircase until you reach the aquifer layer.
1. Make yourself an access to the aquifer layer:
2. Make sure you have at least one dwarf with the pump operating labor enabled. Start pumping the water from one side to another. And build walls around the first quadrant.
3. Deconstruct the water pump, build it facing the other direction and start pumping again. Build walls around the second quadrant accordingly.
4. Deconstruct the pump and the floor tiles in your non-aquifer layer and construct an up/down staircase there instead.
5. The procedure for building walls in the third quadrant differs slightly from what you have been building until now.
6. Now for the last quadrant. We deliberately haven't dug the North-East wall under the stairs. Despite it being aquifer and leaking water, we need it to use it as a water sink now. Remember, aquifers can receive infinite amount of water, too. Deconstruct the pump and build it to pump to the opposite direction. It will spill some water on its level while pumping, but it isn't dangerous.
7. We will now deal with the last piece of aquifer.
When you are digging the downstairs, better have the game paused and proceed step by step (. One-Step). There is usually some water on the level where you are digging from, which would immediately run down the stairs you're digging and make the level below damp. The only way to tell whether there is an aquifer below is to stop the at the very moment when your miner reveals the first tile of it. If it is damp before the water from your level has run down on it, it is another aquifer level.
8. Level done
If you see there is another aquifer layer below, you repeat the steps in sections 1-8. To dig through one layer of aquifer this way will take you 2 or 3 months in-game time.