- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
DF2014 Talk:Double-slit method
"The general method still works fine, however, constructing walls on a tile a pump is sucking from does not seem to work, any more (stuck at "nearly done", always "building site submerged"). Thus, on the final level you'll have to build that wall after relocating the pump. Don't forget to build it, though, or there just might be too much water to evaporate once you're finished. Someone please do screenshots etc and so on and stuff."
I went through the double-slit method last night step by step as listed and experienced no problems with it. I don't know how constructing walls on a tile a pump is sucking from doesn't work - the constructing wall shouldn't be submerged if the pump is sucking water from it.
- Nagidal, author of the article writes: From this description I can't understand at which point exactly you could not proceed. Somebody already reports no problems with it, so maybe you try again following the tutorial more closely. I am currently busy with an ongoing non-aquifer fortress in 40.04, I will try to verify the double-slit method as soon as I'm done with it. I might as well rework it taking Panando's shortcut shown in the linked youtube video. --Nagidal (talk) 17:21, 27 July 2014 (UTC)
I've just tested this on a single-level aquifier, can confirm that there doesn't seem to be an issue. I'm going to remove the top bit, until someone else experiences problems. Hagger (talk) 16:36, 18 September 2014 (UTC)