- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
User:Nagidal/Sandbox
QuantumMenace has developed a very eassy method how to dig through an aquifer of an unknown depth commonly known as the double-slit method. Its name derives from two channeled-out slits around a 2×2 staircase.
The slits are used to break into the aquifer layer, hence their ramps are flooded (blue). During the process of digging through the aquifer, water is being pumped from one slit to another. The pump can pump the water from one slit to another slightly faster than the aquifer floods it. This enables the dwarves to use the ramp of the slit to access the aquifer layer, mine one or two tiles of it and build walls which would seal off the aquifer tiles.
This is a newbie-friendly and detailed tutorial based on Quantum's original forum post.
Tutorial embark setup
Even in this newbie-friendly tutorial it won't harm if you first train this on an embark which you don't intend to play after you've made it through the aquifer. Therefore I suggest you take this embark setup:
- 1 Proficient Miner
- 4 Proficient Masons
- 1 Proficient Carpenter
- 1 Proficient Woodcutter
sell the anvil to buy:
- 30+ stones (you will need 16 pieces of building material per aquifer level)
- 4 logs (to build a carpenter's workshop and the components of a pump)
Make sure you have at least:
- 1 (battle) axe
- 1 pick
to cut down trees and mine
Procedure
Preparation
Using your logs of wood, build a carpenter's workshop and craft all the parts necessary to build a pump, i.e.:
- a block
- an enormous corkscrew
- a pipe section
Digging through the aquifer
Dig a 2×2 staircase until you reach the aquifer layer.
1. Make yourself an access to the aquifer layer:
2. Make sure you have at least one dwarf with the pump operating labor enabled. Start pumping the water from one side to another. And build walls around the first quadrant.
3. Deconstruct the water pump, build it facing the other direction and start pumping again. Build walls around the second quadrant accordingly.
4. Deconstruct the pump and the floor tiles in your non-aquifer layer and construct an up/down staircase there instead.
5. The procedure for building walls in the third quadrant differs slightly from what you have been building until now.
6. Now for the last quadrant. We deliberately haven't dug the North-East wall under the stairs. Despite it being aquifer and leaking water, we need it to use it as a water sink now. Remember, aquifers can receive infinite amount of water, too. Deconstruct the pump and build it to pump to the opposite direction. It will spill some water on its level while pumping, but it isn't dangerous.
7. We will now deal with the last piece of aquifer.
When you are digging the downstairs, better have the game paused and proceed step by step (. One-Step). There is usually some water on the level where you are digging from, which would immediately run down the stairs you're digging and make the level below damp. The only way to tell whether there is an aquifer below is to stop the at the very moment when your miner reveals the first tile of it. If it is damp before the water from your level has run down on it, it is another aquifer level.
8. Level done
If you see there is another aquifer layer below, you repeat the steps in sections 1-8. To dig through one layer of aquifer this way will take you 2 or 3 months in-game time.