v50 Steam/Premium information for editors
- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.
Difference between revisions of "40d Talk:Building designer"
Jump to navigation
Jump to search
(New page: Do we know how much the skill of the designer and the constructor affect the quality of the building? Does it just average out, or does the materials involved skew the results?--~~~~) |
|||
Line 1: | Line 1: | ||
Do we know how much the skill of the designer and the constructor affect the quality of the building? Does it just average out, or does the materials involved skew the results?--[[User:Xazak|Xazak]] 17:39, 4 November 2007 (EST) | Do we know how much the skill of the designer and the constructor affect the quality of the building? Does it just average out, or does the materials involved skew the results?--[[User:Xazak|Xazak]] 17:39, 4 November 2007 (EST) | ||
+ | |||
+ | Both are listed seperately when the structure is selected on the rooms list. Need to check if there are seperate happy thoughts for high quality design and high quality construction.--[[User:Metalax|Metalax]] 02:11, 11 November 2007 (EST) |
Revision as of 07:11, 11 November 2007
Do we know how much the skill of the designer and the constructor affect the quality of the building? Does it just average out, or does the materials involved skew the results?--Xazak 17:39, 4 November 2007 (EST)
Both are listed seperately when the structure is selected on the rooms list. Need to check if there are seperate happy thoughts for high quality design and high quality construction.--Metalax 02:11, 11 November 2007 (EST)