v50 Steam/Premium information for editors
  • v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
  • Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.

Difference between revisions of "40d:Construction"

From Dwarf Fortress Wiki
Jump to navigation Jump to search
(Corrections/updates to strange removal behaviour)
Line 7: Line 7:
 
Constructions behave the same as objects fashioned out of natural rock, although the manner in which they are removed is different.  Stairs and ramps made from natural rock are removed via "Remove Up Stairs/Ramps" ({{k|d}}-{{k|z}}); non-constructed walls and fortifications must be [[mining|mined]] out ({{k|d}}-{{k|d}}); and natural floors are removed by digging a [[channel]] ({{k|d}}-{{k|h}}).  However, all ''constructed'' objects of any type are removed via "Remove Construction" ({{k|d}}-{{k|n}}).   
 
Constructions behave the same as objects fashioned out of natural rock, although the manner in which they are removed is different.  Stairs and ramps made from natural rock are removed via "Remove Up Stairs/Ramps" ({{k|d}}-{{k|z}}); non-constructed walls and fortifications must be [[mining|mined]] out ({{k|d}}-{{k|d}}); and natural floors are removed by digging a [[channel]] ({{k|d}}-{{k|h}}).  However, all ''constructed'' objects of any type are removed via "Remove Construction" ({{k|d}}-{{k|n}}).   
  
== Strange behavior ==
+
== Strange removal behavior ==
  
Once a constructed wall or floor is built, then removed, the remaining floor changes to reflect the material that was originally used in the construction. For instance, if you were to build a [[dolomite]] wall on a square with a [[magnetite]] floor, then remove the dolomite wall construction, the floor underneath would morph into a dolomite floor.
+
Once a constructed wall or floor is built, then removed, the remaining floor changes to reflect the base rock of the tile, rather than any stone, ore or gem vein. For instance, if you were to build a wall on a square of a mined-out [[hematite]] seam within a [[basalt]] rock layer, then remove the wall construction, the floor underneath would become basalt, rather than the original hematite.
More to it, if the floor was smoothed, it will become rough again. Smoothed and detailed floor, however, will be not smothed (rough), but still colored light as detailed, and the engraving can be observed. After second smoothing it'll become '''detailed''' floor again.{{version|0.27.169.33g}}
+
More to it, if the floor was smoothed, it will become rough again. Smoothed and detailed floor, however, will be not smoothed (ie. rough), but still colored light as detailed, and the engraving can be observed. After second smoothing it'll become '''detailed''' floor again.{{version|0.27.176.38c}}
  
 
[[Category:Constructions]]
 
[[Category:Constructions]]

Revision as of 04:47, 12 April 2008

Any object that is normally fashioned out of a naturally-occurring ("rough-hewn") wall can also be built on a completely empty tile as a construction. This includes stairs, ramps, fortifications, and even new walls and floors.

Although "built", constructions are not the same as buildings (such as workshops or furniture), instead functioning as inert terrain objects. Once built, you cannot interact with constructions via the q or t menus (although you can suspend or cancel their construction via these keys).

To build a construction, type b-C. A construction can be built out of any type of stone, blocks, bars, or wood, and requires a mason if made out of stone; a carpenter if made out of wood; or any kind of metalsmith if made out of metal.

Constructions behave the same as objects fashioned out of natural rock, although the manner in which they are removed is different. Stairs and ramps made from natural rock are removed via "Remove Up Stairs/Ramps" (d-z); non-constructed walls and fortifications must be mined out (d-d); and natural floors are removed by digging a channel (d-h). However, all constructed objects of any type are removed via "Remove Construction" (d-n).

Strange removal behavior

Once a constructed wall or floor is built, then removed, the remaining floor changes to reflect the base rock of the tile, rather than any stone, ore or gem vein. For instance, if you were to build a wall on a square of a mined-out hematite seam within a basalt rock layer, then remove the wall construction, the floor underneath would become basalt, rather than the original hematite. More to it, if the floor was smoothed, it will become rough again. Smoothed and detailed floor, however, will be not smoothed (ie. rough), but still colored light as detailed, and the engraving can be observed. After second smoothing it'll become detailed floor again.v0.27.176.38c