- v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
- Use this page to report any issues related to the migration.
Difference between revisions of "Floor"
m (Creating page for DF2014 (78/146)) |
(→Removing floors: Construction removal link, underlying layers no longer revert, because you can't have natural cluster or vein floors anymore) |
||
Line 28: | Line 28: | ||
==Removing floors== | ==Removing floors== | ||
− | Natural and artificial floors can be removed by [[channel]]ing ({{k|d}}-{{k|h}}); constructed floors can be [[ | + | Natural and artificial floors can be removed by [[channel]]ing ({{k|d}}-{{k|h}}); constructed floors can be [[Construction removal|removed]] with {{k|d}}-{{k|n}}. Implied floors may only be removed by deconstructing the wall on the level below. The material used to build the floor will be recovered after the deconstruction. |
− | |||
− | |||
Removing floors can cause [[cave-in]]s if done incorrectly. This often leads to [[fun]] if the floor happens to overhang the [[dining hall]] or other central area. | Removing floors can cause [[cave-in]]s if done incorrectly. This often leads to [[fun]] if the floor happens to overhang the [[dining hall]] or other central area. | ||
Line 92: | Line 90: | ||
... | ... | ||
}}}} | }}}} | ||
− | Dwarves can stand on the red or grey tiles to remove floors. Dwarves will not remove floors that another dwarf is standing on, so if a dwarf decides to stand on a green floor, the removal job could be canceled. | + | Dwarves can stand on the red or grey tiles to remove floors. Dwarves will not remove floors that another dwarf is standing on, so if a dwarf decides to stand on a green floor, the removal job could be canceled. |
==Bugs== | ==Bugs== |
Revision as of 17:12, 31 August 2014
This article was migrated from DF2014:Floor and may be inaccurate for the current version of DF (v50.14). See this page for more information. |
v50.14 · v0.47.05 This article is about the current version of DF.Note that some content may still need to be updated. |
A floor is a fixed map tile that creatures can walk upon (as opposed to movable features like bridges and hatches). A floor can be:
- natural, as found on the surface and in caverns
- artificial, as created by mining
- constructed
- implied, by constructing walls on the z-level below
Note that the different types of floors may be combined: constructed floors can be built over natural, artificial, or implied floors; and an implied floor can be added below any other type of floor. Though it is possible to create a floor with an empty tile below, all wall tiles will have an implied floor above them.
Most buildings can be built on any type of floor. Constructions can be built on any non-constructed floor--a constructed floor must be removed before any other construction can be installed.
Constructing floors
Constructed floors can be built en masse. To do this, use the build -> Construction -> floor command. The keys u,m,k and h are used to change size. Floors may be built on any square which does not already contain a structure, provided your dwarves can reach an adjacent square (this includes building a floor over empty air next to a floor, allowing for the construction of massive cantilevered floors). Diagonals cannot be built from, nor will they support constructions.
The important thing to remember is that all floors, walls, and anything built with the b-C keys are LIFO - "Last In, First Out". That means that the very last designation you make will be the very first thing your builders will work on next! Once you master this concept, it can be used to your advantage, but only if you can plan ahead.
It is also important to remember that you cannot build another construction on top of a constructed floor, but you can build constructions atop natural, artificial and implied floors.
As with all constructions, the material used dictates which labor is required to perform the construction.
When building floors, your builders will carry the material to the job site themselves. A useful tip when building large projects is to first make a stockpile nearby, and only allow one type of material in it. After it fills up, build only as many constructions as there are items in the stockpile. Wait for your haulers to refill the stockpile, then build the next section of the project.
When constructing a floor tile over a walkable tile, the constructing dwarf will move any items in the tile prior to construction. When constructing a floor tile over an unwalkable tile (such as a tree top) any items stuck in the tile will be destroyed when the construction is completed.
Removing floors
Natural and artificial floors can be removed by channeling (d-h); constructed floors can be removed with d-n. Implied floors may only be removed by deconstructing the wall on the level below. The material used to build the floor will be recovered after the deconstruction.
Removing floors can cause cave-ins if done incorrectly. This often leads to fun if the floor happens to overhang the dining hall or other central area. Floors should always be removed in multiple steps, starting at the furthest locations from the support(s) and moving in.
Examples
Key:
+ |
Support - either a wall below or a staircase |
+ |
Unsupported floor, unable to be safely removed |
+ |
Floor able to be safely removed |
. |
Previous site of (removed) floor |
3x3 floor, supported in middle
This example usually has a staircase in the middle supporting it, instead of a wall below (in that case, there would need to be another access point for dwarves to remove the floor, which would make this example much more complicated).
+ | + | + |
+ | + | + |
+ | + | + |
Removing corners first
| → |
| → |
|
Floors are not supported diagonally, so removing all floor tiles orthogonal to another floor will result in a cave-in.
Leaving supports for all corner floors
| → |
| → |
|
Dwarves can stand on the red or grey tiles to remove floors. Dwarves will not remove floors that another dwarf is standing on, so if a dwarf decides to stand on a green floor, the removal job could be canceled.
Bugs
- When removing a constructed floor over a natural or artificial floor, the underlying floor will revert to the base layer type (meaning gem clusters, ore deposits, engravings, etc. that were in the underlying floor are lost).
- An up/down stairway above a wall overrides the implied floor created by the wall. A flying creature can move diagonally into the stairway above the wall, then diagonally back out on the other side of the wall. This shortcut does not work for non-flying creatures (using ramps), nor does it allow liquid to flow through.
Furniture | |
---|---|
Tools | |
Access | |
Constructions | |
Machine and trap parts |
Axle • Gear assembly • Lever • Mechanism • Millstone • Pipe section • Pressure plate • Roller • Screw pump • Support • Trap • Water wheel • Windmill |
Other buildings | |
Related articles |