v50 Steam/Premium information for editors
  • v50 information can now be added to pages in the main namespace. v0.47 information can still be found in the DF2014 namespace. See here for more details on the new versioning policy.
  • Use this page to report any issues related to the migration.
This notice may be cached—the current version can be found here.

Difference between revisions of "Wall"

From Dwarf Fortress Wiki
Jump to navigation Jump to search
m (+ "therefore")
 
(17 intermediate revisions by 12 users not shown)
Line 1: Line 1:
{{quality|Fine}}{{av}}
+
{{migrated article}}
 +
{{Quality|Unrated}}{{av}}
  
A '''wall''' is either a [[map tile]] or a [[construction]] that blocks access to [[creatures]] and [[Flow|fluids]]. The appearance of a constructed wall is similar to that of a [[smoothing|smoothed]] natural wall but it works the same as any filled tile composed of mountain rock, [[clay]] or [[soil]]. Walls either occur naturally (e.g. a Rough-hewn Andesite Wall), or can be constructed. With constructed walls it is possible to create multi-level [[building]]s such as [[archery tower]]s complete with roofs by creating [[floor]]s on the layer above. A wall fills the tile it is in and creates a walkable space above it.
+
A '''wall''' is either a [[map tile]] or a [[construction]] that blocks access to [[creatures]] and [[Flow|fluids]]; though many creatures can [[Climber#Climbing_safety|climb many walls]]. The appearance of a constructed wall is similar to that of a [[smoothing|smoothed]] natural wall, but it works the same as any filled tile composed of [[stone]], [[clay]] or [[soil]]. Walls either occur naturally (e.g. a Rough-hewn Andesite Wall), or can be constructed. With constructed walls, it is possible to create multi-level [[building]]s such as [[archery tower]]s complete with roofs by creating [[floor]]s on the layer above. A wall fills the tile it is in and creates a walkable space above it.
  
 
== Digging ==
 
== Digging ==
[[File:walls.png|thumb|120px|Walls and pillars.]]As explained on the [[digging]] page, naturally occurring walls can be dug out using the {{Key|d}}esignations {{Key|d}}ig command, or c{{Key|h}}annel command. These tasks are carried out by dwarves with the [[mining]] labor activated.
+
[[File:walls.png|thumb|120px|Walls and pillars.]]As explained on the [[digging]] page, naturally occurring walls can be dug out using the {{Key|d}}igging {{Key|m}}ine command, or channel command {{K|u}}. These tasks are carried out by dwarves with the [[mining]] labor activated.
  
Natural walls can be designated for {{K|s}}moothing and {{K|e}}ngraving to improve the appearance and value of the wall.  These tasks are carried out by dwarves with the [[stone detailing]] labor activated.
+
Natural walls can be designated for s{{K|m}}oothing and en{{K|g}}raving to improve the appearance and value of the wall from the {{K|v}} menu.  These tasks are carried out by dwarves with the [[stonecutter]], [[engraver]] labor respectfully activated.
  
 
== Construction ==
 
== Construction ==
  
Walls can be built ''en masse''. To do this, use the {{K|b}}uild -> {{K|C}}onstruction -> {{K|w}}all command. The keys {{K|u}},{{K|m}},{{K|k}} and {{K|h}} are used to change size. Walls may be built on any square which does not already contain a structure, provided your dwarves can reach an adjacent square (this includes building a wall over empty air next to a floor, allowing for the construction of inverted pyramids). Diagonals cannot be built from, nor will they support constructions.
+
Walls can be built ''en masse''. To do this, use the {{K|b}}uild -> Co{{K|n}}struction -> wa{{K|l}}l command. Walls may be built on any square which does not already contain a structure, provided your dwarves can reach an adjacent square (this includes building a wall over empty air next to a floor, allowing for the construction of inverted pyramids). Diagonals cannot be built from, nor will they support constructions.
  
The important thing to remember is that all walls, floors and anything built with the {{K|b}}-{{K|C}} keys are LIFO - "Last In, First Out". That means that the very last designation you make will be the very first thing your builders will work on next! Once you master this concept, it can be used to your advantage, but only if you can plan ahead.
+
The important thing to remember is that all walls, floors, or anything built with the {{K|b}}-{{K|n}} keys are LIFO - "Last In, First Out". That means that the very '''last''' designation you make will be the very '''first''' thing your builders will work on next! Once you master this concept, it can be used to your advantage, but only if you can plan ahead.
  
It is also important to remember that you cannot build on top of a constructed floor, but you can build a wall on top of another constructed wall, even though the upper surface of a wall is otherwise indistinguishable from a constructed floor.  
+
When building walls across gaps, it helps to take advantage of the fact that walls can be constructed on top of a constructed floor. This is important, since a wall cannot be constructed while standing on top of an adjacent wall tile, as one would extend a constructed floor over empty space by standing on the previously-built tile. To build across a gap, construct a floor exactly where the wall will go, and then build the wall on top of this (but in the reverse direction; see the previous paragraph). Each wall tile constructed this way will therefore require two units of material, which may be recovered on deconstructing the tile. It is possible to cut this requirement in half by constructing a temporary walking surface (sometimes called "scaffolding") next to each planned wall tile, then building the wall over the adjacent open space, then removing the temporary construction, and repeating as necessary, with each iteration widening the wall by one tile until the wall is the desired width. For such multi-tile width walls, it may speed construction to build the next scaffold before removing the previous one.
  
Constructed walls cannot be engraved, but can be carved into [[fortification]]s ({{K|d}}esignate - carve {{K|F}}ortifications). Unlike constructed fortifications, those created from walls retain an implied [[floor]] on the level above. As usual, the fortifications will block movement, but not [[liquid]]s or small objects such as [[bolt]]s.
+
Constructed walls made from [[stone]]s cannot be smoothed, but can be engraved or carved into [[fortification]]s ({{K|v}}-{{K|f}}ortifications). Unlike constructed fortifications, those created from walls retain an implied [[floor]] on the level above. As usual, the fortifications will block movement, but not [[liquid]]s or small objects such as [[bolt]]s.
  
Normal walls are considered 'rough'. By using [[stone]], [[glass]], [[wood]], or [[metal]] [[block]]s, higher-quality constructions can be built with increased value.  This can be particularly important when trying to maximize the value of a [[noble|noble]]'s [[room]].
+
Normal walls are considered 'rough'. By using [[stone]], [[glass]], [[wood]], or [[metal]] [[block]]s, higher-quality constructions can be built with increased value.  This can be particularly important when trying to maximize the value of a [[noble]]'s [[room]].
  
As with all [[construction]]s, the material used dictates which [[labor]] is required to perform the construction.
+
The [[labor]] required to perform the construction can be found under Other Jobs, Wall/Floor Construction.
  
 
When building walls, your builders will carry the material to the job site themselves. A useful tip when building [[megaproject|large projects]] is to first make a stockpile nearby, and only allow one type of material in it. After it fills up, build only as many constructions as there are items in the stockpile. Wait for your haulers to refill the stockpile, then build the next section of the project.
 
When building walls, your builders will carry the material to the job site themselves. A useful tip when building [[megaproject|large projects]] is to first make a stockpile nearby, and only allow one type of material in it. After it fills up, build only as many constructions as there are items in the stockpile. Wait for your haulers to refill the stockpile, then build the next section of the project.
Line 34: Line 35:
  
 
== Removing Walls ==
 
== Removing Walls ==
 
+
[[File:DFwikiWallRemoved.png|right|]]
To remove a wall, open the {{Key|d}}esignations menu and select {{Key|n}} Remove Construction. This task will be carried out by a dwarf with the [[construction removal]] labor enabled.
+
To remove a wall, open the {{Key|m}}ining (Previously {{Key|d}}esignation) menu and select {{Key|x}} Remove Construction. This task will be carried out by a dwarf with the [[construction removal]] labor enabled.
  
 
== Notes ==
 
== Notes ==
* Walls do not have any effect on [[Noise|noise]].
+
* Walls do not have any effect on [[noise]].
 
* If a wall that is the only support for a structure is removed, it will [[Cave-in|collapse]], most likely hurting any dwarves on or around it.
 
* If a wall that is the only support for a structure is removed, it will [[Cave-in|collapse]], most likely hurting any dwarves on or around it.
 
* If a tree is near your wall, sometimes dwarves will climb the wall to climb on the tree. If this happens, dwarves could get hurt from falling out of the tree.
 
* If a tree is near your wall, sometimes dwarves will climb the wall to climb on the tree. If this happens, dwarves could get hurt from falling out of the tree.

Latest revision as of 17:10, 19 March 2024

This article is about the current version of DF.
Note that some content may still need to be updated.

A wall is either a map tile or a construction that blocks access to creatures and fluids; though many creatures can climb many walls. The appearance of a constructed wall is similar to that of a smoothed natural wall, but it works the same as any filled tile composed of stone, clay or soil. Walls either occur naturally (e.g. a Rough-hewn Andesite Wall), or can be constructed. With constructed walls, it is possible to create multi-level buildings such as archery towers complete with roofs by creating floors on the layer above. A wall fills the tile it is in and creates a walkable space above it.

Digging[edit]

Walls and pillars.

As explained on the digging page, naturally occurring walls can be dug out using the digging mine command, or channel command u. These tasks are carried out by dwarves with the mining labor activated.

Natural walls can be designated for smoothing and engraving to improve the appearance and value of the wall from the v menu. These tasks are carried out by dwarves with the stonecutter, engraver labor respectfully activated.

Construction[edit]

Walls can be built en masse. To do this, use the build -> Construction -> wall command. Walls may be built on any square which does not already contain a structure, provided your dwarves can reach an adjacent square (this includes building a wall over empty air next to a floor, allowing for the construction of inverted pyramids). Diagonals cannot be built from, nor will they support constructions.

The important thing to remember is that all walls, floors, or anything built with the b-n keys are LIFO - "Last In, First Out". That means that the very last designation you make will be the very first thing your builders will work on next! Once you master this concept, it can be used to your advantage, but only if you can plan ahead.

When building walls across gaps, it helps to take advantage of the fact that walls can be constructed on top of a constructed floor. This is important, since a wall cannot be constructed while standing on top of an adjacent wall tile, as one would extend a constructed floor over empty space by standing on the previously-built tile. To build across a gap, construct a floor exactly where the wall will go, and then build the wall on top of this (but in the reverse direction; see the previous paragraph). Each wall tile constructed this way will therefore require two units of material, which may be recovered on deconstructing the tile. It is possible to cut this requirement in half by constructing a temporary walking surface (sometimes called "scaffolding") next to each planned wall tile, then building the wall over the adjacent open space, then removing the temporary construction, and repeating as necessary, with each iteration widening the wall by one tile until the wall is the desired width. For such multi-tile width walls, it may speed construction to build the next scaffold before removing the previous one.

Constructed walls made from stones cannot be smoothed, but can be engraved or carved into fortifications (v-fortifications). Unlike constructed fortifications, those created from walls retain an implied floor on the level above. As usual, the fortifications will block movement, but not liquids or small objects such as bolts.

Normal walls are considered 'rough'. By using stone, glass, wood, or metal blocks, higher-quality constructions can be built with increased value. This can be particularly important when trying to maximize the value of a noble's room.

The labor required to perform the construction can be found under Other Jobs, Wall/Floor Construction.

When building walls, your builders will carry the material to the job site themselves. A useful tip when building large projects is to first make a stockpile nearby, and only allow one type of material in it. After it fills up, build only as many constructions as there are items in the stockpile. Wait for your haulers to refill the stockpile, then build the next section of the project.

When constructing a wall over a walkable tile, the constructing dwarf will move any items in the tile prior to construction. When constructing a wall over an unwalkable tile (such as a tree top) any items stuck in the tile will be destroyed when the construction is completed.

Building walls in damp conditions[edit]

When trying to build walls in damp conditions (such as when digging through an aquifer in a soil layer), you need to make sure that the area to be built on and the area the dwarf needs to stand on to build from are at 1/7 or 0/7 when you set the order to build the wall.

If the area the dwarf needs to stand on is 2/7 when the wall is designated to be built, then the dwarf will try to build the wall by standing in the space the wall will occupy, and will never complete the work.

If there are multiple areas, then at least one must be at 1/7, and the dwarf may ignore those which were at 2/7 or greater, even if they subsequently drop to 1/7 or dry out entirely.

Removing Walls[edit]

DFwikiWallRemoved.png

To remove a wall, open the mining (Previously designation) menu and select x Remove Construction. This task will be carried out by a dwarf with the construction removal labor enabled.

Notes[edit]

  • Walls do not have any effect on noise.
  • If a wall that is the only support for a structure is removed, it will collapse, most likely hurting any dwarves on or around it.
  • If a tree is near your wall, sometimes dwarves will climb the wall to climb on the tree. If this happens, dwarves could get hurt from falling out of the tree.

Bugs[edit]

  • Dwarves will once again wall themselves out of the fortress (a regression caused by the fix for the "Dwarf cancels construction of Wall: Creature occupying site" errors). To avoid this behavior, make sure the building material you choose is "inside" the fortress (i.e. closer to your fortress center). Manufactured building materials (like blocks) provide much more control of the location, and consequently the direction the dwarf will approach the build site.
"Wall" in other Languages Books-aj.svg aj ashton 01.svg
Dwarven: adil
Elven: ferale
Goblin: umâ
Human: olo

Furniture
Animal trapAnvilArmor standBedBlocksBox (chest • coffer) • BucketCabinetCage (aquarium • terrarium) • Coffin (casket • sarcophagus) • RestraintSlabStatueTableThrone (chair) • Weapon rack
Tools
AltarBookcaseDisplay (display case • pedestal) • HiveNest box

Access
BarsBridgeDoor (portal) • FloodgateGrateHatchRoadWindow
Constructions
Machine and trap parts
Other buildings

Related articles